History

CR Inspection - by Taak Web Agency Prato

Our history

Retrace the history of CR inspection over the years.

history

Our history

Retrace the history of CR inspection over the years.

 

CR Inspection

Over the years

^
2013

January

Riccardo Conti began working as a freelancer, continuing to work in the fields of experience cultivated during his stay as an employee in Ecosim srl first (No. Bo. 1091) and then in Bureau Veritas Italia S.p.A.

^
2013

March

Acquisition of a Welding Inspector order for the lashing of GTG2 modules for the Gorgon project in Marina di Carrara.

^
2013

July – August

Acquisition of QA/QC order for lashing GTG3 modules for Gorgon project. First phase of ship outfitting in Navalmare (SP) and then lashing on board in Marina di Carrara.

^
2013-2014

December – January

Acquisition of QA/QC order for lashing GTG 4 and 5 modules for Gorgon project. First phase of ship outfitting in Navalmare (SP) and then lashing on board in Marina di Carrara.

^
2014

March

Acquisition of QA/QC order for lashing Fired Heaters for Gorgon project. First phase of ship outfitting and then lashing on board in Sattahip and Laem Chabeng, Thailand.

^
2014

April

NACE Coating Inspector qualification.

^
2014

January-June

Verification of the earthing system according to Presidential Decree 462/01 of the hospitals of Milan, Niguarda and Policlinico.

^
2014

14 July

Establishment of CR Inspection s.r.l.s., a sole shareholder company.

^
2014

August

PED conformity assessment following a fire in the paper drying line of Cartiera di Cologno SPA.

^
2015-2020

August

Start of the contract as NDT Specialist for NCOC, ENI’s operating company in Kazakhstan on the Kashagan project. Initial assignment for the manufacture of the EPC2 – EPC3 extraction modules. Later extended contract for the installation phases of the aforementioned modules, prefabrication and installation of the EPC4 module, shutdown of island A and Well Conversion Project on island D.

^
2018

October

National assignment of thickness tests on LPG storage tanks for Energas S.p.A.

^
2020

May

Provision of a mobile laboratory for the execution of acoustic emission tests on underground LPG tanks. Mobile laboratory equipped with an open-cycle pressurization system.

^
2020/2021

Assignments for PED pipe mapping (drafting of isometric sketches for thickness traceability) and reporting art. 16 of Ministerial Decree 329/04 of pre-PED equipment for:
– Aversana Petroli (NA)
– UniCoop Firenze (FI)
– Synthesis Chemistry (PV)

^
2021

Execution of noise emission tests on LPG storage tanks at depots of:
– Liguria Gas (Cairo Montenotte – SV)
– Elgas (Capannori – LU)

^
2021

Leak tests on underground tanks with SDT method, approved by Unichim Manual

^
2020-2022

Smart-working assignment as NDT Specialist for NCOC. Coordination of PAUT validation activities on Inconel 625 and focal point for site activities related to welding/NDT.

^
2022-2023

Contract as QC Coordinator/NDT Specialist on behalf of Saipem in United Arab Emirates (Shah Gas Project). Coordination of site activities in prefab, on-site activities during shutdown. ADNOC Client

^
2022

December

CR Inspection changes its name from S.r.l.s. to S.p.A.

^
2023

March

CR Inspection obtains accreditation from Accredia in accordance with the UNI EN ISO/IEC 17024 standard for the certification of non-destructive testing personnel according to UNI EN ISO 9712

^
2023

June

CR Inspection becomes a Notified Body with respect to the PED Directive 2014/68/EU for the certification of NDT personnel operating on permanent joints of category III and IV pressure equipment

^
2023

July

CR Inspection obtains accreditation from Accredia in accordance with the UNI EN ISO/IEC 17020 standard for the verification of earthing systems according to Presidential Decree 462 of 2001

^
2023

July

CR Inspection moves to its new headquarters in Agliana (PT) in Via G.Galilei 95

Our team is constantly growing and evolving.
Watch our team and fill out the work with us form.

×