2013
January
Riccardo Conti began working as a freelancer, continuing to work in the fields of experience cultivated during his stay as an employee in Ecosim srl first (No. Bo. 1091) and then in Bureau Veritas Italia S.p.A.
2013
March
Acquisition of a Welding Inspector order for the lashing of GTG2 modules for the Gorgon project in Marina di Carrara.
2013
July – August
Acquisition of QA/QC order for lashing GTG3 modules for Gorgon project. First phase of ship outfitting in Navalmare (SP) and then lashing on board in Marina di Carrara.
2013-2014
December – January
Acquisition of QA/QC order for lashing GTG 4 and 5 modules for Gorgon project. First phase of ship outfitting in Navalmare (SP) and then lashing on board in Marina di Carrara.
2014
March
Acquisition of QA/QC order for lashing Fired Heaters for Gorgon project. First phase of ship outfitting and then lashing on board in Sattahip and Laem Chabeng, Thailand.
2014
April
NACE Coating Inspector qualification.
2014
January-June
Verification of the earthing system according to Presidential Decree 462/01 of the hospitals of Milan, Niguarda and Policlinico.
2014
14 July
Establishment of CR Inspection s.r.l.s., a sole shareholder company.
2014
August
PED conformity assessment following a fire in the paper drying line of Cartiera di Cologno SPA.
2015-2020
August
Start of the contract as NDT Specialist for NCOC, ENI’s operating company in Kazakhstan on the Kashagan project. Initial assignment for the manufacture of the EPC2 – EPC3 extraction modules. Later extended contract for the installation phases of the aforementioned modules, prefabrication and installation of the EPC4 module, shutdown of island A and Well Conversion Project on island D.
2018
October
National assignment of thickness tests on LPG storage tanks for Energas S.p.A.
2020
May
Provision of a mobile laboratory for the execution of acoustic emission tests on underground LPG tanks. Mobile laboratory equipped with an open-cycle pressurization system.
2020/2021
Assignments for PED pipe mapping (drafting of isometric sketches for thickness traceability) and reporting art. 16 of Ministerial Decree 329/04 of pre-PED equipment for:
– Aversana Petroli (NA)
– UniCoop Firenze (FI)
– Synthesis Chemistry (PV)
2021
Execution of noise emission tests on LPG storage tanks at depots of:
– Liguria Gas (Cairo Montenotte – SV)
– Elgas (Capannori – LU)
2021
Leak tests on underground tanks with SDT method, approved by Unichim Manual
2020-2022
Smart-working assignment as NDT Specialist for NCOC. Coordination of PAUT validation activities on Inconel 625 and focal point for site activities related to welding/NDT.
2022-2023
Contract as QC Coordinator/NDT Specialist on behalf of Saipem in United Arab Emirates (Shah Gas Project). Coordination of site activities in prefab, on-site activities during shutdown. ADNOC Client
2022
December
CR Inspection changes its name from S.r.l.s. to S.p.A.
2023
March
CR Inspection obtains accreditation from Accredia in accordance with the UNI EN ISO/IEC 17024 standard for the certification of non-destructive testing personnel according to UNI EN ISO 9712
2023
June
CR Inspection becomes a Notified Body with respect to the PED Directive 2014/68/EU for the certification of NDT personnel operating on permanent joints of category III and IV pressure equipment
2023
July
CR Inspection obtains accreditation from Accredia in accordance with the UNI EN ISO/IEC 17020 standard for the verification of earthing systems according to Presidential Decree 462 of 2001
2023
July
CR Inspection moves to its new headquarters in Agliana (PT) in Via G.Galilei 95